Place festival infrastructure on the site.
Start from an aerial image or written site brief, assign infrastructure layers and give crew leads a current view of placed work.
Illustrative outdoor event study.
The planning path
Review a draft site with scale from imagery or a stated dimension. Put tents, stage, power, restrooms and access on separate layers. Assign a vendor its layer and check where a moved item appears in the crew lead view.
Before the drawing goes to crews
Check the site footprint and access routes against the responsible site owner. Confirm each utility location with its provider. Keep capacity, permit and engineering decisions in the proper review process; a 3D view cannot approve them.
Check before sharing the plan.
- Identify the aerial source or stated site dimensions.
- Place stage, tents, power and restrooms on named layers.
- Confirm a vendor sees its own assigned layer.
- Check the new position of a moved item on the crew lead’s phone.
Questions before choosing.
- Is the site larger than the published bands?
- The current single-event list ends at 2,500 guests for $799; larger events require a custom quote.
- Who certifies access and capacity?
- Use the site owner and responsible authorities. A working plan is not a surveyed boundary, fire route or permitted occupancy.
- Do you need dedicated map design?
- Compare OnePlan’s event mapping and design support if the map itself is the primary deliverable.