The assigned plan reaches the field.

A crew lead sees an assigned layer on a phone. Move an item in the planner view and its new position appears in that field view.

Illustrative site plan of Mossbank Meadow.
Mossbank Meadow is a fictional design drawing, not a survey.
Public aerial imagery of a park meadow under the Mossbank Meadow example drawing
Mossbank Meadow site planMossbank Meadow, a static design-study plan showing 120 canonical objects across 14 layers.
  1. Tents
  2. Stage and production
  3. Power distribution
  4. Catering and bars
  5. Restrooms and handwashing
  6. Guest seating and tabletop
  7. Entry and ticketing
  8. Food-truck court
  9. Parking and shuttle loop
  10. Fencing and emergency access
  11. Back of house and load-in
  12. Waste and recycling
  13. Guest circulation
  14. Lighting

Mossbank Meadow. USGS / USDA NAIP, acquired 2019-08-03. No endorsement or venue partnership.

Open the assigned layer

A crew lead sees the work assigned to that layer rather than the planner’s complete workspace. That makes the site plan usable at the point where placement matters.

See where the tent moved

The planner moves tent T-01 on the site plan. Its new position appears in the crew lead’s assigned-layer view on a phone.

Use the actual plan

The site plan remains the reference for the planner, assigned vendors and field lead. Keep printed plans, radios and site procedures where the event requires them.

Illustrative tented dinner study.
Illustrative tented dinner study.